Building discover: Lee Avenue closed from 15 August


Cityview Drive North to Brycegarden Lane

Date of Discover: August 4, 2022

in regards to the challenge

Town is working with the T. Musselmann excavations to put in sewer and water pipes and to resurface the highway floor.

This challenge helps a growth challenge at 4-12 Lee Avenue. For extra details about the event please contact [email protected],

work begins from 15 august

Work is predicted to start on or round Monday, August 15 and can take about two weeks to finish as climate permits.

off lee road

Throughout building Lee Avenue shall be closed to by visitors from Cityview Drive North to Brycegarden Lane. Native visitors shall be permitted alongside Lee Avenue, nevertheless, there shall be no by entry at 4-12 Lee Avenue.

pedestrian entry

The north sidewalk between Cityview Drive North and Brycegarden Lane shall be closed to pedestrians throughout building. To entry the South sidewalk, please use the close by crossings at Cityview Drive North and Kearney Avenue.

use of property

Each effort shall be made to keep up entry to the driveway within the building space throughout working hours (7 a.m. to 7 p.m.). Building actions and the motion of apparatus might quickly have an effect on entry to non-public property.

metropolis ​​providers

There shall be no interruption in any service to town throughout the building. Rubbish assortment is not going to be affected. Please proceed to maintain your inexperienced, blue and brown automobiles on the curb as per your common schedule.

building space map

Town appreciates your persistence, understanding and cooperation throughout this necessary building challenge. Any updates shall be posted at guelph.ca/building.

for extra data

Brent Neville, Mission Supervisor
T. Musselman Excavation
519-634-1113
[email protected]

both

Jason Robinson, Building Engineering Technologist II
Engineering and Transportation Providers
metropolis ​​of guelfi
519-822-1260 Extn 2241
[email protected]



Supply hyperlink